Planning Permission – Permitted Development
Permitted development means you do not need to seek planning permission from your local planning authority (council), and that you may build away subject to meeting certain criteria.
This is our basic guide to the General Permitted Development Order (for houses, not flats or maisonettes). Obviously we have to say that this is some rough guidance for you. For chapter and verse, please check with your local council, planning consultant, or of course, contact us.
In general, planning permission is not required provided the new extension to the house does not exceed more than 50% of the total size of the land that your house sits on, and the extension is not more than 50% of the size of your original house. So for example, if the total curtailage (grounds) of your property is 100m2, then your new extension cannot be bigger than a 50m2 footprint. The original house size is considered as it was built originally, and if very old, how it was in 1948. This means any extensions already applied have to account for the whole 50%. So, for example, if your house is 100m2, and you already have a permanent new garage or shed built a few years ago which is 25m2, you can still have an extension, but only up to 25m2.
The rules also completely change if you are in a SSSI, national park or world heritage site. Perhaps best if you give us a quick call for a chat if this is all confusing.
There are a few other general size requirements which are all common sense really:
- The new extension cannot be higher than the old house, measured to eaves (bottom of roof) height.
- The roof line should stay the same as original (if necessary)
- The extension or outbuilding cannot be beyond the line of the principle aspect of the house – you can go on to the back or sides but not make the house protrude further forward
- An extension such as conservatory cannot protrude out from the main house more than 3 meters if semi detached, or 4 meters if detached. This includes adding on to a previous extension.
- If it is a detached outbuilding you are looking at, it is generally permitted development if it is at least 2m from the boundary, and is for enjoyment incidental to the main dwelling.
- For an extension, the total height should not exceed 4 meters
- For an outbuilding, the total height should not exceed 4 meters for a normal dual pitched roof, 2.5 meters if within 2 meters of a boundary, or 3 meters in any other case (flat or single pitch roof).
- A new extension ON TOP of a previous extension will not be permitted development
- Verandahs, balconies and platforms are not permitted development (other than a Juliet balcony which is a frame in front of an opening)
- Materials used should be ‘similar’ in appearance
- Up until May 2019, if you get started, and you ask your neighbour nicely, you may have an extension of 8m from the property for detached, and 6m from the property If any other type of house
For porches, they must be more than 2 meters from a boundary, measure no more than 3m2, and be no more than 3m tall to benefit from permitted development.
If the above does not fit then you still have the option to seek planning permission. Its not necessarily scary provided what you are proposing is a sensible addition.
Building Regulations
Provided there is no sleeping accommodation, and the extension or outbuilding is <15m2 then you will not need to apply for compliance with building regulations. Typically, if the extension or outbuilding is <30m2 you will also not need it, but worth checking. Anything over that is still achievable, but we will need to go through a regularisation process in order to make sure the building complies on items like access, electrical safety, fire safety and thermal insulation values. Again, none of this is a problem as all of our buildings are to specification – a poorly built structure will cost more to heat and decrease the value of your home – and we all know that’s not the aim.
Land & Title
You should always check the land title and any potential restrictive covenants (such as right of way, restriction due to utilities), before looking to construct on a new section of your property. The title plan can be obtained for as little as £3 online https://www.gov.uk/get-information-about-property-and-land/search-the-register. It is also essential to know the existence of any underground infrastructure such as drainage, gas, water or power and safely mitigate against causing damage. Consider whether there are any other hidden costs which may occur such as having to increase the capacity of heating, drainage, surface drainage etc. Don’t panic, we can help you with all of this.